Houston Sewer Connection Permit Fee: Reading the 2026 Schedule
Houston’s 2026 fee schedule lists $201.41 for a plumbing sewer connection line; labor and right-of-way costs remain separate.
Houston’s citywide fee schedule lists a plumbing sewer connection line at $201.41 effective January 1, 2026. The city fee schedule is the numerical source; the Houston Permitting Center provides application context.
Use $201.41 as the permit component only when the project matches that sewer-connection line. It is not an installed sewer price. Excavation, pipe, restoration, inspections, engineering, and plumber labor can be separate. A contractor who says “permit included” should identify this exact line or another category.
Ask whether the connection runs from a private building sewer to the public main, whether work occupies a right-of-way, and whether another building permit or review applies. Keep the city fee and construction estimate separate.
Request the permit category in writing before signing the construction contract. A fee allowance without the category can hide a second review or right-of-way charge.
This Houston schedule was checked September 8, 2026; confirm the effective table before payment.
Before excavation, ask Houston whether the work needs a right-of-way permit, inspection, or additional plumbing category. Put the $201.41 line beside the permit number and identify pass-through charges separately when the estimate includes restoration or traffic control.
Use the city’s category as the comparison point when two plumbers quote “sewer permit.” Ask whether the line is a building-to-main connection or a repair on private property, and whether the address sits inside the city’s permitting jurisdiction. Request a permit number and an itemized estimate before approving excavation; a $201.41 allowance cannot establish that roadway review, inspection, or restoration is included.
Related Articles
Frozen pipe repair: thawing, burst repairs, and restoration scope
A frozen pipe may need safe thawing, leak monitoring, or emergency replacement after it splits. Use this guide to separate shutoff, plumbing repair, drying, and finish restoration in a winter damage quote.
Jackson, Wisconsin Plumbing Permit Fees: Fixtures, Minimums, and Reinspection
Jackson’s 2026 schedule uses $10 fixture connections, a $65 minimum, and $75 first reinspection; scope changes the bill.
Portland Sewer Connection Permit Fees: BES and PBOT Charges
Portland’s guide lists a $352 BES sewer connection permit and $295 PBOT inspection for specified lateral work.
Portland Rain Drain Permit Fee: The $50 Public-Works Line
Portland’s July 2026 transportation schedule lists a $50 rain-drain permit line, separate from connection and repair work.